Bentonite & Additives

BENT-N Sodium BentoniteNPT-BENT-N

Selected natural sodium bentonite with high montmorillonite content — high yield and low fluid loss make it the base for all engineered slurries.

Product Overview

One-liner: The base material for engineered slurry, Selected natural sodium bentonite with high montmorillonite content — high yield and low fluid loss make it the base for all engineered slurries.

BENT-N is selected natural sodium bentonite with high montmorillonite content and swelling capacity. The hydrated slurry forms a tight, low-loss filter cake. Use it alone or compounded with the PAM polymer series for sand, pebble and rock wall protection.

High yield

Montmorillonite content ≥ 75% gives more slurry per tonne.

Low fluid loss

A tight filter cake keeps fluid loss at ≤ 15 mL.

Good compatibility

Stable and complementary when compounded with the polymer series.


Applicable Strata / Scenarios

Strata typeTypical scenarioRecommended ratioExpected effect
SandBase slurry8%–10% slurryTight cake, stable wall
PebbleCompound make-up6%–8%Higher cuttings carry
RockCirculating slurry adjustment4%–6%Lower fluid loss
Complex groundWith polymer seriesAs requiredComplementary performance
!Assess product suitability for the strata and working conditions through on-site trial mixes; ratios on this page are indicative and should be adjusted using trial results and engineer advice.

Technical Data Sheet

Quantified core indices for product selection and tender comparison; a test report ships with every batch.

Test itemSpecificationTest method
Montmorillonite content≥ 75%Methylene blue
Swelling index≥ 15 mL/2gSwelling index test
Fluid loss≤ 15 mLAPI filter press
Moisture≤ 12.0%Oven drying
Fineness (200 mesh pass)≥ 95%Sieving
Yield point / PV ratioAdjustable by compounding6-speed viscometer

How to Use / Mix Design

StepKey pointsReference dosage
Make-upDose bentonite toward the target slurry density8%–10% (by mass)
HydrateStir for 2–4 hours for full hydration and swelling—
CompoundCombine with PAM-S / PAM-P as neededAs required
MaintainCheck fluid loss and sand content regularlyOnce per shift
iMix design varies with strata, borehole diameter and working conditions. Perform trial mixes before use and determine dosage from the results; include the strata report, borehole diameter and construction requirements when seeking advice.

Related Solutions


Related Cases


GET A QUOTE

Tell us your strata conditions —
get tailored selection advice

Share your strata, borehole diameter and schedule; engineers will reply with mix advice, quantity estimates and lead time. Your information is used only for this enquiry.

✓On-site strata compatibility assessment (per project arrangement)
✓Batch test report & certificate with every shipment
✓On-site mix commissioning by our engineers (per project arrangement)
✓Samples and product brochures on request
Sales hotline
Business email
Form mode
For a quick conversation, leave your name, phone and a short message. Choose detailed project requirements if you have strata, borehole diameter or schedule data.
Filled in from the entry point you used; you can change it
We will contact you to discuss your requirements.