Overseas · Port works

Seawater-ground slurry flocculation: 28% less bentonite

An overseas port project mixed slurry with seawater at about 32‰. Conventional mud flocculated out in the salt and could not form a film on the wall; bentonite consumption was high and remote resupply pushed costs up.

Project overview

Region
Overseas
Project type
Port works
Project scale
Overseas port piles mixed with seawater at about 32‰ salinity

Construction challenges

The main construction challenges encountered on this project.

Challenge 1Salt flocculation

At about 32‰, conventional mud flocculated out and could not film the wall.

Challenge 2Wall protection

Without a film, walls were under-protected — collapse and slurry loss rose.

Challenge 3Material cost

Seawater make-up burned through bentonite, and remote resupply was costly.


Solution & materials

Materials and mix ratios used step by step on this project, for reference by similar works.

StageMaterialFunctionRatio / dosage
Salt resistanceHDS-9 SeaShieldBlocks salt degradation, restores filming in seawater0.5%–0.8%
Base slurryBENT-N sodium bentoniteSeawater make-up base (28% less via compounding)6%–8%
RheologyCMC-NViscosify & control loss, steady the wall0.3%–0.5%
MaintainCompound top-upTune with per-shift testingAs required

Implementation notes

The project switched to an HDS-9 SeaShield salt-resistance scheme: BENT-N base slurry compounded with HDS-9 and CMC-N for stable rheology. The mud stopped flocculating in 32‰ seawater and filmed the wall again. With staged top-ups and per-shift testing, bentonite use fell 28% at 35‰ salt tolerance, and hole quality met specification.


Delivered results

35‰
Salt tolerance
28%
Bentonite reduction
How results were verifiedOn-site salinity and slurry property testing plus bentonite consumption records


Related products

GET A QUOTE

Tell us your strata conditions —
get tailored selection advice

Share your strata, borehole diameter and schedule; engineers will reply with mix advice, quantity estimates and lead time. Your information is used only for this enquiry.

✓On-site strata compatibility assessment (per project arrangement)
✓Batch test report & certificate with every shipment
✓On-site mix commissioning by our engineers (per project arrangement)
✓Samples and product brochures on request
Sales hotline
Business email
Form mode
For a quick conversation, leave your name, phone and a short message. Choose detailed project requirements if you have strata, borehole diameter or schedule data.
Filled in from the entry point you used; you can change it
Additional strata (multiple choices)
We will contact you to discuss your requirements.