Southwest · Bridge piles

Pile drilling through pebble strata: 100% hole acceptance

Main-pier piles of a major bridge in Southwest China crossed deep pebble beds with stones over 800 mm. Φ1500 holes shrank to Φ1380, blocking cage installation, and bottom sediment ran thick — more than 4 clean-out passes per pile.

Project overview

Region
Southwest
Project type
Bridge piles
Project scale
Main-pier piles at Φ1500 mm through pebbles over 800 mm

Construction challenges

The main construction challenges encountered on this project.

Challenge 1Undercut

A weak protective layer let the hole shrink after drilling, hampering cage installation.

Challenge 2Thick sediment

Large pebble cuttings settled fast, leaving bottom sediment beyond specification.

Challenge 3Repeated clean-out

Over 4 clean-out passes per pile tied up crews and rigs.


Solution & materials

Materials and mix ratios used step by step on this project, for reference by similar works.

StageMaterialFunctionRatio / dosage
Make-upPAM-PHigh-carry main material1:250
Base slurryBENT-NBase make-up8%
ThickeningCMC-NRaises yield point0.3%
PurifyPond flocculationFast cutting separation80 g/m³

Implementation notes

Switching to the PAM-P high-carry system with CMC-N to raise yield point built a cemented ring on the wall and eliminated undercut. Adding pond flocculation separated cuttings quickly. Clean-out dropped to within 2 passes per pile, hole acceptance hit 100% and piling sped up 22% per pile.


Delivered results

100%
Hole acceptance
22%
Faster pile drilling
How results were verifiedHole acceptance records plus clean-out pass and drilling-hour logs


Related products

GET A QUOTE

Tell us your strata conditions —
get tailored selection advice

Share your strata, borehole diameter and schedule; engineers will reply with mix advice, quantity estimates and lead time. Your information is used only for this enquiry.

✓On-site strata compatibility assessment (per project arrangement)
✓Batch test report & certificate with every shipment
✓On-site mix commissioning by our engineers (per project arrangement)
✓Samples and product brochures on request
Sales hotline
Business email
Form mode
For a quick conversation, leave your name, phone and a short message. Choose detailed project requirements if you have strata, borehole diameter or schedule data.
Filled in from the entry point you used; you can change it
Additional strata (multiple choices)
We will contact you to discuss your requirements.