Solutions · Equipment support

Rotary Drilling Rig Support Package

A slurry parameter package matched to rig model and bucket conditions — 22% faster hole completion per pile.

Solution overview

Application methods
旋挖灌注桩施工
Problem type
Equipment support

Scenario and construction challenges

Rotary rigs working interbedded pebble and soil: viscosity and carry must match bucket type and rotation speed to cut cuttings fall-back and collapse.

Challenge 1Cuttings fall-back

Weak carry lets cuttings drop back to the bottom when the auger is pulled.

Challenge 2Bit balling

Too much viscosity balls up the bucket and slows discharge, cutting efficiency.

Challenge 3Bottom sediment

Poor clean-out leaves sediment too thick and hurts pile quality.


Complete solution

Each scheme pairs materials with dosing; the table below lists material, role and ratio per step.

StageMaterialFunctionRatio / dosageWorking conditionScope
MatchPAM-PViscosity by bucket type1:300Interbedded pebble/soil, bucket 0.8–1.5 m³Rotary rig drilling
Density tuneBENT-NAdjust slurry density6%Slurry density running lowRotary circulation density adjustment
PurifyPAM-POOLMud-pond clarification80–150 g/m³High solids load in the mud pondRotary slurry circulation clean-up
MaintainCompound top-upTune with pile depthAs requiredPile depth >40 m with long circulationDepth-based top-up
iWorking conditions and scope in the reference mix table are typical values; actual dosages must be confirmed by on-site trials with raw water, soil samples and project design, and do not constitute a performance commitment.

Delivered results

22%
Faster pile drilling
-30%
Clean-out time cut
≤50mm
Bottom sediment thickness
✓The figures above are measured data from this project (indicative). Actual performance varies with strata and working conditions; a full case report is provided together with the delivered solution.

Construction schematic & site photos

Use the schematic and site photos to follow the process and slurry flow; final parameters follow on-site trial results.

Construction schematic

① Rig set-up ② Slurry matched to bucket type ③ Cuttings settling ④ Pond purification & reuse

Site photos

Main-pier pile site
Wall inspection
Pile area overview

Related cases

GET A QUOTE

Tell us your strata conditions —
get tailored selection advice

Share your strata, borehole diameter and schedule; engineers will reply with mix advice, quantity estimates and lead time. Your information is used only for this enquiry.

✓On-site strata compatibility assessment (per project arrangement)
✓Batch test report & certificate with every shipment
✓On-site mix commissioning by our engineers (per project arrangement)
✓Samples and product brochures on request
Sales hotline
Business email
Form mode
For a quick conversation, leave your name, phone and a short message. Choose detailed project requirements if you have strata, borehole diameter or schedule data.
Filled in from the entry point you used; you can change it
Additional strata (multiple choices)
We will contact you to discuss your requirements.